Infrastructure · Water

PWB Bull Run Filtration Project

LEED Gold Admin Building + Envision site certification

  • Rendering of the Bull Run Filtration administration building at the main gate
  • Aerial rendering of the Bull Run filtration facility with Mt. Hood beyond
  • Aerial rendering of the Bull Run filtration facility among fields and forest

Overview

ecoREAL is working with Brown and Caldwell on the Owner's Rep team for Portland Water Bureau's largest infrastructure investment in decades. We facilitated the Early Design Meeting eco-charrette with Energy Trust of Oregon, manage ODOE's Green Energy Technology 1.5% requirement (and serve on ODOE's GET Advisory Board), and lead the LEED Enhanced, Monitoring-Based, and BECx commissioning programs.

Key contributions

  • Eco-charrette facilitation with ETO incentive coordination
  • ODOE GET 1.5% requirement management — ecoREAL serves on the GET Advisory Board
  • LEED Enhanced + Monitoring-Based Commissioning + Building Enclosure Commissioning
  • Envision infrastructure site certification administration
  • Synergies between Envision, LEED, and WELL mapped out in a custom matrix
  • Pacificmark Construction used Green Canary to streamline and automate LEED v4 submittal tracking
Type
Infrastructure · Water
Location
Bull Run Watershed, OR
Years
2018 – 2028
Certification
LEED Gold + Envision
Contractor
Pacificmark Construction
ecoREAL Role
Owner's Rep Sustainability (with Brown and Caldwell) and Green Canary
Owner
Portland Water Bureau